Recently Completed Projects

UCSF ORTHOPAEDIC INSTITUTE, San Francisco, CA
Design/assist 40,000 sq. ft. interior tenant improvement on behalf of UCSF Dept. of Orthopaedics. Project features 4 OR and 2 Procedure rooms with patient prep and recovery areas under OSHPD III code. Imaging areas include 3 X-ray suites and a GE MR750 3-Tesla magnet. To complete the center, a Human Performance Center and Prosthetics Laboratory were constructed as well as administrative and educational space. Final Cost = $12 million.

__________

UCSF M-3 NORTH DUAL 3T MRI's, San Francisco, CA
Arguably one of the most challenging MRI projects ever done, Cameron Builders, Inc. was brought in during the design phase on a CM@Risk agreement to assist in the final design, and ultimately construct, a dual GE MR750 3-Tesla MRI suite in the 3rd floor center of functioning UCSF Moffitt Hospital, Parnassus Campus. Due to the weight, mechanical requirements and magnetic field issues of two side-by-side high field magnets, this project's success is a testimate to the expertise and dedication of Cameron Builders, UCSF and the entire design team.

__________

UCSF CHINA BASIN LANDING, San Francisco, CA
Design/Build 50,000 sq. ft. interior tenant improvement on behalf of UCSF and McCarthy Cook. Project features a ground floor 10,000 sq. ft. imaging center including two GE 1.5T Twin Speed MRI suites, one GE 3T MRI suite, two Philips MX-8000 CT suites, bone densitometry, and associated patient and administrative space.

Third floor features 30,000 sq. ft. of administrative, educational and research laboratories including Varian NMR suite, OR suite, Chemistry and various research and imaging laboratories. Project is also complimented by state-of-the-art conference and classroom facilities.

__________

UCSF ACC 3T MRI, San Francisco, CA
Replacement of existing 1.5T MRI system with new 3 Tesla MRI system by GE Medical Systems. Project located in ACC building of UCSF’s Parnassus St. campus.

__________

LIBERTY PACIFIC MEDICAL IMAGING, Palmdale, CA
Design/Build imaging center in downtown mid-rise structure to accommodate the Siemens Symphony 1.5T MRI system, Ultra-sound and C-arm equipment. The first of three projects to be completed on behalf of Liberty Pacific Medical Imaging this year.

__________

SAN FRANCISCO MAGNETIC RESONANCE CENTER, San Francisco, CA
Design/Build 6000 sq. ft. imaging center to accommodate General Electric 1.5T MRI, Hitachi Airis II MRI, and Siemens CTI PET.

__________

SANTA ROSA IMAGING CENTER, Santa Rosa, CA
6500 sq. ft. imaging center to accommodate Siemens Sonata 1.5T MRI, Siemens Concerto .25T Open MRI and Siemens Sensation 16-slice CT system.

__________

MD SERVICES MRI, Honolulu , HI
Design/Build interior renovation to accommodate Hitachi Altaire .7T High Field Open MRI system.

__________

CARMICHAEL OPEN MRI, Carmichael, CA
Ground up addition and interior tenant improvement to accommodate Hitachi Altaire .7T High Field Open MRI system.

__________

SANTA CRUZ IMAGING CENTER, Santa Cruz, CA
Design/Build 5000 sq. ft. tenant improvement to accommodate Hitachi Altaire .7T High Field Open MRI system and Toshiba Aquilion CT system.

   
     

Client List

UCSF Radiology Department
Liberty Pacific Medical Imaging
McCarthy Cook & Associates
Mt. Zion Medical Center
UCSF Design & Construction
UC Davis Medical Center
UCSF Parnassus Campus
Stanford University Medical Center
CVB 3200, LLC
Radiological Associates of Modesto
MD Services
San Francisco Veterans Administration
Comprehensive Medical Imaging
David Feinberg, PhD.
Salinas Valley Urology
Radiological Management Group of Santa Cruz
Doctors’ Resources Co., LLC
Omneuron
Body Plan of Walnut Creek
Insight
Philips Medical Systems
GE Medical System
Hitachi Medical Systems
Sacramento Radiology Medical Group
Siemens Medical Systems
Dynamic Medical Imaging of Ohio
San Francisco Advanced Imaging
Castro Valley Advanced Medical Imaging
Honolulu Open Medical Imaging