Recently Completed Projects
UCSF
ORTHOPAEDIC INSTITUTE, San Francisco, CA
Design/assist 40,000 sq. ft. interior tenant improvement on
behalf of UCSF Dept. of Orthopaedics. Project features 4 OR and 2 Procedure rooms with patient prep and recovery areas under OSHPD III code. Imaging areas include 3 X-ray suites and a GE MR750 3-Tesla magnet. To complete the center, a Human Performance Center and Prosthetics Laboratory were constructed as well as administrative and educational space. Final Cost = $12 million.
__________
UCSF
M-3 NORTH DUAL 3T MRI's, San Francisco, CA
Arguably one of the most challenging MRI projects ever done, Cameron Builders, Inc. was brought in during the design phase on a CM@Risk agreement to assist in the final design, and ultimately construct, a dual GE MR750 3-Tesla MRI suite in the 3rd floor center of functioning UCSF Moffitt Hospital, Parnassus Campus. Due to the weight, mechanical requirements and magnetic field issues of two side-by-side high field magnets, this project's success is a testimate to the expertise and dedication of Cameron Builders, UCSF and the entire design team.
__________
UCSF
CHINA BASIN LANDING, San Francisco, CA
Design/Build 50,000 sq. ft. interior tenant improvement on
behalf of UCSF and McCarthy Cook. Project features a ground
floor 10,000 sq. ft. imaging center including two GE 1.5T
Twin Speed MRI suites, one GE 3T MRI suite, two Philips MX-8000
CT suites, bone densitometry, and associated patient and administrative
space.
Third floor features 30,000
sq. ft. of administrative, educational and research laboratories
including Varian NMR suite, OR suite, Chemistry and various
research and imaging laboratories. Project is also complimented
by state-of-the-art conference and classroom facilities.
__________
UCSF ACC 3T MRI, San Francisco,
CA
Replacement of existing
1.5T MRI system with new 3 Tesla MRI system by GE Medical
Systems. Project located in ACC building of UCSF’s Parnassus
St. campus.
__________
LIBERTY PACIFIC MEDICAL IMAGING,
Palmdale, CA
Design/Build imaging center
in downtown mid-rise structure to accommodate the Siemens
Symphony 1.5T MRI system, Ultra-sound and C-arm equipment.
The first of three projects to be completed on behalf of Liberty
Pacific Medical Imaging this year.
__________
SAN FRANCISCO MAGNETIC RESONANCE
CENTER, San Francisco, CA
Design/Build 6000 sq. ft.
imaging center to accommodate General Electric 1.5T MRI, Hitachi
Airis II MRI, and Siemens CTI PET.
__________
SANTA ROSA IMAGING CENTER, Santa
Rosa, CA
6500 sq. ft. imaging center
to accommodate Siemens Sonata 1.5T MRI, Siemens Concerto .25T
Open MRI and Siemens Sensation 16-slice CT system.
__________
MD SERVICES MRI, Honolulu , HI
Design/Build interior renovation
to accommodate Hitachi Altaire .7T High Field Open MRI system.
__________
CARMICHAEL OPEN MRI, Carmichael,
CA
Ground up addition and
interior tenant improvement to accommodate Hitachi Altaire
.7T High Field Open MRI system.
__________
SANTA CRUZ IMAGING CENTER, Santa
Cruz, CA
Design/Build 5000 sq. ft.
tenant improvement to accommodate Hitachi Altaire .7T High
Field Open MRI system and Toshiba Aquilion CT system. |